Halley VI buildings have just been raised to keep them out of the constant snow accumulation for another year. Here is the view of the modules before raising.
And a similar view after raising about 2.5m
To raise the buildings the legs are lifted in turn and snow bulldozed under each one.
Once all the legs are sitting on a high lump of snow then the hydraulics lift the who station up. The whole area is then bulldozed and groomed to a smooth surface. This is me standing in front of the south end of the station now that its all been lifted up and the snow surface groomed.
No comments:
Post a Comment